Rorke Data The Galaxy 65 Spécifications Page 65

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 100
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 64
Chapter 4: Subsystem Connection and Operation
Power Off Procedure
4-9
System power-on self test is completed.
System is accessing different interfaces.
Verifying installed cache memory.
System is ready. You can now start to configure
the subsystem.
System is ready for I/Os.
4.3 Power Off Procedure
To power down the Galaxy subsystem, please follow these steps:
NOTE:
When powering down the Galaxy subsystem, please ensure that no time-consuming
processes, like a “Logical Drive Parity Regeneration” or a “Media Scan,” are taking
place.
1. Stop I/O access to the system.
Stop all I/O accesses to the Galaxy subsystem and host applications. Please refer to
the related documentation for your applications.
2. Flush the cache.
Power on
Init Completed
GALAXYHD
256MB RAM, Wait…
GALAXYHD
No Host LUN
GALAXYHD
Ready
GALAXYHD
Vue de la page 64
1 2 ... 60 61 62 63 64 65 66 67 68 69 70 ... 99 100

Commentaires sur ces manuels

Pas de commentaire